We installed the compressor package, interconnecting piping and tie-ins during a tightly scheduled outage window.
9910 34 St NW, Edmonton, AB
Office Mon–Fri 7am–5pm · Dispatch 24/7
An expansion adding a third compressor unit to increase throughput at an existing station.
Fort St. John, BC
Completed 2025
Compressor package setting
Interconnecting piping
Tie-ins during outage window
Commissioning support
A few more jobs our crews have completed across the region.
Edmonton, AB
Completion and tie-in support for a 14-well Montney pad, delivered without a single recordable incident.
View project →
Kakwa, AB
22 km of gathering line built on schedule through a wet spring break-up.
View project →
Fox Creek, AB
A 21-day planned turnaround finished two days early.
View project →
Peace River, AB
Abandonment and reclamation of 38 legacy wells under a regulatory closure program.
View project →
Edmonton, AB
Pneumatic device retrofits and leak detection across 120 well sites.
View project →
Fort St. John, BC
Mechanical and piping installation for a new compressor unit at an existing station.